When applying this flooring over concrete take note of the grade level.
Installing glue down vinyl plank flooring on concrete.
For the purpose of installing vinyl plank flooring the concrete does not have to be perfectly level only smooth.
If your subfloor is not perfect or has some slopes you shouldn t worry because you are gluing down the planks.
Flooring went down last week and that always takes a project from work site to almost finished in a hot minute.
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing.
The adhesive on self stick planks is pressure sensitive and one of the problems with it is that it won t adhere to a dusty or nonlevel surface.
As much as this flooring material may seem to be a perfect flooring it would be prudent to consider vinyl plank flooring pros and cons.
Then use a level to find any spots where the ground is uneven and apply concrete self leveling compound to even it out.
Vinyl planks can be sorted into three main categories based on their installation method.
Vinyl has a no wax finish but depending on the manufactuerer it can also come in a urethane finish.
How to install vinyl plank flooring.
With minimal effort tiles or planks can be replaced one by one if needed.
To install vinyl plank flooring on concrete you ll first need to clean the concrete with soap and water and fill in any cracks with concrete filler.
Suspended on grade and below grade concrete subfloors need to be moisture tested prior to installation.
Before installing vinyl plank flooring determine which type of vinyl plank best suits your renovation needs.
Feel free to ask any questions.
The important thing is for your subfloor to be free of any debris.
When it comes to glue down vinyl plank flooring you can choose self sticking planks or planks that require a coat of adhesive on the subfloor.
Vinyl plank flooring is a great choice for installation over concrete subfloors.
Vinyl plank installation on concrete makes the floor warm and comfortable.
We tried to keep everything as simple and easy as we can.
Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company.
Today i m sharing some tips tools and tricks to installing vinyl plank over concrete.
And then baseboard is another leap forward it s so exciting.
You glue down the planks directly onto the subfloor.
Gripstrip click lock and glue down.