You just lay it over top.
Installing engineered vinyl plank floor.
To finish installing vinyl plank flooring replace the baseboards and add floor transitions and additional trim pieces like shoe molding if desired.
Wide you d divide 123 by 5 75 which is 21 39.
Your goal is to create the flattest smoothest surface possible as the underlayment for the vinyl plank flooring.
Vinyl plank flooring can usually be laid right over existing flooring but if there are any high spots they should be sanded down to create a flush surface for the new floor.
Vinyl plank is a floating floor which means you don t ever actually attach it to the underlay.
Measure the width of the room and divide it by the width of the exposed portion of the plank before you start installing vinyl plank flooring.
Tips for installing vinyl plank over concrete floors.
1108 sq ft of a beautiful luxury vinyl plank installation was all that this basement needed.
This wood grain vinyl makes this basement look as though it has.
Wide seams between the tiles can create slight depressions in the vinyl flooring.
Do not install in wet areas like patios and showers or in exterior areas.
If the tile floor has wide or deep seams use an underlayment rather than installing the vinyl directly on the tile.
Engineered vinyl plank flooring.
You leave enough of a gap around the edge that it can expand contract flex whatever but that it s hidden by baseboard.
That is it would take 21 39 planks to complete the floor.
If installing over a crawlspace you must have a minimum of 18 inches of.
The hardest part about it floating is to.
Vinyl has a no wax finish but depending on the manufactuerer it can also come in a urethane finish.
This floor can be installed below on or above grade level.
Prepare the floor.
Gripstrip click lock and glue down.
See the product s warranty for details.
For example if your room measures 123 in and your flooring is 5 75 in.
This flooring installs like laminate flooring.
Vinyl flooring can be installed directly over ceramic and porcelain tile flooring.
Cracked or missing tiles should be fixed or filled in.