Engineered is actually produced with three to five layers of hardwood.
Installing engineered hardwood floors on concrete subfloor.
When installing engineered hardwood floors over radiant heated subfloors turn the heat off for 24 hours before during and after installation.
Determining moisture content of both the wood flooring and the subfloor is an important part of quality control in the flooring installation process.
Slabs less than 60 days old are generally too wet to install floors.
Glue nail staple and float.
Measure and mark the center of all four walls at floor level.
It s critical to unpack and acclimate the engineered hardwood flooring under monitored conditions.
To learn about our products standards and warranties send us an email or call 1 800 832 9023 mon fri 8 a m.
Made from layers of real wood compressed together engineered hardwood floors are better able to handle changes in moisture and humidity than solid hardwood.
For a concrete subfloor you should install the plank with the sight lines of the floor.
If a wood subfloor is in place measure the moisture content percentage mc of the wood subfloor and the engineered wood flooring to confirm all the engineered hardwood is acclimated and suitable for installation.
Handling the engineered hardwood.
Test for dryness new concrete is heavy with moisture and it must be a minimum of 30 days old before moisture testing begins.
If you ve decided to install engineered hardwoods there are four possible installation methods depending on the subfloor.