If you re installing bamboo in a new home allow the slab to cure at least 60 days to reduce moisture issues in the concrete before laying the new flooring.
Installing bamboo flooring on concrete slab.
Use a moisture test kit to ascertain the level of moisture in the floor and therefore the amount of time the bamboo planks should be laid out on the concrete.
The morning star or supreme bamboo tongue and groove floors and morning star click floors can be glued down to concrete on or above grade using adhesive.
The most important factor is to use an approved urethane wood floor adhesive with vapor sound barrier and the trowel that is used specifically for that adhesive in this method you will adhere the bamboo flooring directly to the concrete slab.
Now it is essential that the bamboo flooring must be acclimated with the concrete before installing it.
The two main installation methods over concrete.
I cannot install a sleeper floor there because i just can t sacrifice the headroom.
The concrete slab failed a moisture test which prevents me from installing the bamboo without a moisture barrier.
Clean the floor well with a pressure washer if it is an older concrete floor to remove any.
Quality bamboo flooring costs 5 to 8 per square foot which is about the same as common hardwood flooring like oak and maple.
Also can another type of flooring be installed on top of the bamboo floor or does it need to be entirely removed.
Yes depending on the style flooring you choose.
Hard to do with glue thanks.
The glue down method can be used for solid or engineered bamboo flooring.
When you re looking for flooring options to cover concrete slabs trust the professionals at 50 floor to guide you to the perfect product.
Open up the bamboo flooring and lay it on the concrete for 48 to 72 hours.
Should i have been advised yo install a barrier or to consider other type of flooring for our home which is in a low lying area.
Can i install bamboo on a concrete slab.
Cheaper brands of bamboo flooring may contain glues the emit harmful vocs look for products that are guaranteed to emit no or very low amounts of vocs and that have been certified as sustainably harvested by the forest stewardship council fsc.
Allow the concrete floor to cure for between 60 and 90 days if new before installing the bamboo.
The floor was glued to the concrete slab.
Put the best flooring over concrete slabs with 50 floor.
1 clean the slab by vacuuming away all.